Skip to content

BESS Solutions for IDC

Data center energy storage uses high energy density lithium iron phosphate batteries and rapid switch technology to replace traditional lead-acid battery + UPS data center power supply solutions. This increases storage scale, saves occupied area, ensures long-term grid supply without real-time UPS operation loss, effectively reduces data center PUE, and participates in power auxiliary services through peak shaving and valley filling for peak-valley arbitrage. This creates a “data-grid collaborative” system for demand-side response.awakening dormant resources and revitalizing idle assets.
Application Scenarios

Presently, our country houses over 400, 000 data centers, consuming around 1.5% of the total social electricity annually. Many lDCs operate at an energy efficiency (PUE) of around 2.5. However, our advanced data centers operate at a PUE of less than 1.6.Unlike conventional data center backup power sources that utilize lead-acid batteries with their low energy density, short lifespan, and significant pollution, our solution offers a greener, more efficient alternative.

Technology and Innovation

Unyielding Focus On Production and Research For Constantly Evolving

Power Electronics Control Technology

Power Electronics Control Technology

Offer high stability, reliable performance, and support for multiple scenarios. Millisecond-level technology for swift on-grid/off-grid switching

High-protection Battery Safety Management Technology

High-protection Battery Safety Management Technology

Early detection, accurate positioning, swift handling;4-level Battery Management System (BMS) technology;Multi-dimensional fire detection technology;Multi-level fire protection technology

Expertise in Integrated Technology

Expertise in Integrated Technology

High-level protection, backed by authoritative certification. Capabilities in high-altitude and extreme cold protection technology. Precise temperature control technology. Certified by JTU Rail Certification Center (JRCC)

EPC Delivery Capability

EPC Delivery Capability

Excellent professional qualifications; Wide business distribution; Diversed benchmark projects
CASE

Focus on technological innovation fuels industry growth, aids the energy revolution,and brings us closer to a Zero-carbon Earth.

BEIJING
WORKERS STADIUM

Location:BeijingStorage
Capacity:250kW/1000kWh
Operation Mode:Peak shaving

STATE GRID’S THREE
STATIONS INTEGRATED PROJECT

Location:BeijingStorage
Capacity:250kW/1000kWh
Operation Mode:Peak shaving

STATE GRID ONSHORE
CHARGING PROJECT

Location:Shanghai/Anji, ZhejiangStorage
Capacity:1MW/2MWh
Operation Mode:Electric container

products

Provides targeted products for various solutions

Empowering The Global Energy Transition